There are two common ways to get a major remodel, addition or custom home built. In the traditional route, often called design-bid-build, you hire an architect to draw the project, then take the drawings to contractors for bids. In design-build, one company handles both the design and the construction under a single contract.
How design-bid-build works
- You hire an architect or designer and pay for the design.
- The drawings go out to several contractors for bids.
- You pick a contractor, usually on price, and sign a second contract.
- The architect may stay involved to answer questions during construction, for an added fee.
The strength of this approach is competitive bidding and an independent designer looking out for you. The weakness is that nobody prices the design while it's being drawn. It's common for bids to come in well over budget, and then the design has to be cut back and redrawn. During construction, problems with the drawings become change orders, and the architect and builder can point at each other.
How design-build works
- You meet one team that discusses goals and budget together.
- Design happens with builders and estimators at the table, so the project is priced as it's drawn.
- You approve a detailed price before construction starts.
- The same company builds what it designed and is responsible for both.
The strength is accountability and budget control: the people drawing the plans know what things cost and how they get built. The trade-off is that you aren't collecting competing bids on identical drawings, so choose a design-build firm whose pricing is detailed and transparent.
Which is right for your project?
- Design-build tends to fit additions, whole-home renovations, kitchens, basements, ADUs and most custom homes, where budget control and one point of contact matter most.
- Design-bid-build tends to fit projects where you already have an architect you love, a highly unusual architectural design, or a requirement to bid the work competitively.
Questions to ask any design-build firm
- Is design billed separately, and is it credited toward construction?
- Will I get a line-item price, or a single lump sum?
- How are allowances set, and what happens if my selections cost more?
- Who will be my day-to-day contact during construction?
- Can I see a finished project like mine and talk to that client?