Kitchen remodels planned around how you actually cook

Most kitchen remodels start with the finishes. We start with the layout: where you prep, where people gather, what wall is in the way. Then we design, permit and build it, including the structural and mechanical work other remodelers subcontract out.

What a full kitchen remodel with us covers

  • Layout redesign: moving the sink, range or island, adding a pantry, or opening into the family room.
  • Load-bearing wall removal with engineered beams, so you get an open plan without sagging floors upstairs.
  • Cabinetry in stock, semi-custom or custom lines, including built-in banquettes and coffee bars.
  • Counters, tile and flooring, with flooring carried into adjoining rooms so there's no patchwork.
  • Electrical and lighting: dedicated appliance circuits, under-cabinet and recessed lighting, and panel upgrades if needed.
  • Plumbing and ventilation, including gas lines and range hoods ducted outside.

Opening up a closed kitchen

Many North Atlanta homes built from the 1960s through the 1990s have a kitchen walled off from the living spaces. Taking that wall out is the most requested change we make. When the wall is load-bearing, we have it engineered, install a flush beam where the ceiling allows, and reroute any ductwork, plumbing or wiring that runs through it.

Living through a kitchen remodel

We'll help you set up a temporary kitchen, usually a microwave, coffee maker and fridge in a nearby room. We keep a fixed schedule so you know which weeks are loud, and we seal off the work area to keep dust out of the rest of the house.

What affects the cost

Every project is priced line by line after we've seen your home. These are the factors that move the number most:

  • Keeping the layout versus moving plumbing and gas
  • Removing a load-bearing wall
  • Cabinet line: stock, semi-custom or custom
  • Counter material and amount of tile
  • Appliance package
  • Electrical panel capacity

You'll get a detailed written price before construction starts, and any change after that is priced and approved by you before the work happens.

Common questions

Can you remove the wall between my kitchen and living room?

Usually, yes. If it's load-bearing, a structural engineer sizes a beam and we install it. We'll also reroute anything running inside the wall.

Do you supply cabinets or can I buy my own?

Either. We work with cabinet suppliers at several price points, and we'll install owner-supplied cabinets if they're ordered to our measurements.

How long will I be without a kitchen?

Typically 6 to 12 weeks, depending on scope. Ordering cabinets and counters before demolition keeps that window as short as possible.

Do kitchen remodels need a permit?

Any electrical, plumbing, gas or structural work does, and that's most kitchen remodels. We pull and close out every permit.

Areas we serve

Related services

Tell us about your project

We'll talk through your goals, budget and timing, then visit your home to look at what's possible. The first consultation is free.

Call Request a consultation